HVAC · Air hygiene · Engineering

Your trusted partner for clean, efficient air.

Padocx Exergy keeps air-conditioning and ventilation systems clean, balanced and reliable — for hospitals, commercial buildings, factories and the oil & gas industry across Malaysia.

Why Padocx?

The smartest HVAC partner for critical facilities

Flexible ventilation duct above a ceiling

Healthier indoor air

Source-removal duct cleaning, anti-microbial treatment and IAQ testing that stands up to DOSH ICOP-IAQ limits.

Rows of air-conditioning condenser units with fans

Lower running costs

Clean coils, balanced airflow and tuned plant mean less energy for the same comfort — and fewer breakdowns.

Oil and gas refinery towers and pipework under a blue sky

Built for harsh duty

Refurbishment and retrofits that harden HVAC for oil & gas, marine and 24/7 industrial environments.

The Padocx difference

One team. Every part of the air system.

  1. 01

    End-to-end HVAC partner

    Inspection, cleaning, maintenance, balancing, refurbishment and retrofit — one accountable team from survey to sign-off.

  2. 02

    Robotics & full evidence

    Our in-house camera robot and rotary-brush tooling reach ducts others can’t, and every job is documented before, during and after.

  3. 03

    Standards first

    Method statements built on NADCA ACR 2021, ASHRAE 62.1 / 170 / 180, DOSH ICOP-IAQ and the OSH Act 1994.

  4. 04

    Works around your operations

    Parallel crews, shutdown-window planning and after-hours work keep wards, plants and tenants running.

About Padocx Exergy
Technician in protective gear testing an electrical control panel

Services

Most things HVAC — done properly.

From a single split unit to a refinery control room, our crews inspect, clean, maintain, balance, refurbish and retrofit air systems to recognised standards.

View all services
  1. 01Air-Conditioning ServicesInstallation, preventive maintenance and breakdown repair for split, VRF, packaged, FCU, AHU and chiller systems.
  2. 02Duct Cleaning & SanitisationSource-removal cleaning of supply, return and exhaust ductwork to NADCA ACR practice, with anti-microbial treatment.
  3. 03Robotic Duct CleaningOur in-house camera robot and drill-driven rotary brushes reach duct runs and risers no person can enter — cleaning and filming as they go.
  4. 04CCTV & Visual InspectionCamera and borescope surveys of ductwork, plenums and units — so you clean, repair or replace only what needs it.
  5. 05Air Balancing (TAB)Testing, adjusting and balancing of air and water systems so every room gets its design airflow and pressure.
  6. 06Indoor Air Quality AssessmentIAQ assessment to the DOSH Industry Code of Practice — CO₂, temperature, humidity, particulates, VOCs and microbial counts.
  7. 07AC Unit RefurbishmentStrip-down overhaul of AHUs, FCUs and packaged units — coils, fans, motors, insulation and casings restored to like-new.
  8. 08Oil & Gas HVAC RetrofitRetrofitting AC and ventilation units for hazardous, corrosive and offshore environments in the oil and gas industry.
  9. 09Disinfection & FoggingULV fogging and anti-microbial surface treatment for rooms, wards and plant spaces — terminal sanitisation done properly.
  10. 10Ventilation & Exhaust SystemsDesign, installation and upgrade of fresh-air, exhaust, smoke-extract and kitchen ventilation systems.
  11. 11Chiller & AHU MaintenanceComprehensive maintenance contracts for central plant — chillers, cooling towers, pumps and air handling units.
  12. 12HVAC Energy AuditFind where your cooling energy goes — and the upgrades that pay back fastest.

How it works

Robotic duct cleaning, step by step

Isolation-room exhausts and supply ducts are cleaned through existing openings only. Our robot and rotary-brush tooling reach the riser; our crew handles the rest. Pick a side of the system to see the sequence.

Exhaust riser · cross-sectionRobot cam
Exhaust riser cross-section showing the cleaning sequenceLevel aboveIsolation roomShaftTop hatch · winchNew HEPAHEPA housingAccess panelFloor louvreHEPA VACExhaust fanExhaust riser

Riser cleaning sequence

01 / 10

Isolation room at Hospital Shah Alam after cleaning and handover

Featured project

21 negative-pressure isolation rooms. Five shutdown windows.

At Hospital Shah Alam we cleaned and sanitised the supply and exhaust systems of 21 isolation rooms across NICU, ICU, CCU and seven wards — each handed back inside its ward shutdown window, with a complete photo, video and robot-camera record.

Rooms
21
Working days
7
Camera footage
5h 14m
Video clips
164
Read the case study

Measured, not assumed

Clean air, held to the code

IAQ assessment
<500CFU/m³
Airborne bacteria limit under the DOSH ICOP-IAQ — the benchmark our IAQ assessments test against.
≤1,000ppm
Target CO₂ level for occupied spaces — a simple, telling sign of adequate ventilation.
23–26°C
Recommended indoor temperature band, held alongside 40–70% relative humidity.
12months
Recommended interval for IAQ assessment and HVAC hygiene inspection in healthcare.

Work aligned with the standards that matter

  • NADCA ACR 2021HVAC system cleaning & restoration
  • ASHRAE 62.1Ventilation for acceptable IAQ
  • ASHRAE 170Ventilation of healthcare facilities
  • ASHRAE 180Inspection & maintenance of HVAC
  • DOSH ICOP-IAQ 2010Industry Code of Practice on IAQ
  • OSH Act 1994Occupational Safety & Health (Act 514)
  • ISO 45001Occupational health & safety
  • ISO 14001Environmental management

Ready to start working together? So are we.

Tell us about your building, plant or facility. We’ll come back within one working day with next steps — a site survey, inspection or a clear quotation.

Get in touch